PHANTOM supports carbon neutrality and ESG goals

Why PHANTOM

Benefits That Change Everything

From environmental compliance to operational savings — PHANTOM delivers measurable advantages across every dimension of waste management.

60%

Volume Reduction

Less waste to handle

0

Harmful Emissions

No dioxins or toxins

10yr

Maintenance Cycle

Exceptional durability

3

Reuse Outputs

Compost · Feed · Fuel

Environmental & Permitting

Install Faster. Operate Cleaner.

Because PHANTOM produces zero harmful emissions, obtaining installation permits is dramatically faster than incinerators. No smokestacks, no NIMBY complaints, no public opposition.

Permitting Made Simple

Incinerators require years of environmental impact assessments, community hearings, and air quality permits. PHANTOM's zero-combustion, zero-emission design bypasses the most time-consuming regulatory hurdles — getting you operational months or years sooner.

  • No smokestacks — no air quality permits needed
  • No dioxins, furans, or harmful gas emissions
  • Indoor installation safe — no NIMBY opposition
  • Sealed system — zero odour complaints from neighbours

Circular Economy

PHANTOM doesn't just reduce waste — it transforms it into materials with genuine downstream value. Select your input materials to control output: compost, feed, or fuel.

  • Nutrient-rich compost for agriculture
  • Liquid fertiliser for horticulture
  • Livestock feed supplement
  • Biomass fuel feedstock (~5,000 kcal/kg)

Comparison

Traditional Incinerator vs PHANTOM

See how PHANTOM outperforms conventional waste treatment across every critical measure.

Traditional Incinerator

  • Dioxins and furans released
  • High CO₂ emissions
  • Soil and groundwater contamination risk

PHANTOM System

  • Zero dioxins or harmful gases
  • CO₂ only from boiler (minimal)
  • Sealed system — no contamination

Operational Benefits

Built for Business Efficiency

Engineered for minimal operational overhead and maximum return on investment.

Rapid Processing

30-Minute Cycle

Process up to 3 tonnes of organic waste per 30 minutes. High-speed hydrolysis dramatically outperforms conventional treatment methods.

Low Maintenance

10-Year Service Interval

The robust round-type furnace requires major maintenance only every 10 years. Minimal downtime means maximum uptime for your facility.

Compact Footprint

Space-Efficient Design

60% volume reduction means far less storage space needed. Modular containerised units fit within existing facility footprints.

Complete Sterilisation

100% Pathogen Elimination

High temperature and pressure eliminates all pathogens, bacteria, and harmful organisms — safe for downstream handling and reuse.

Automated Operation

Minimal Labour Requirement

Touch-button start. PLC-controlled cycle runs autonomously — no skilled operator required. One staff member can oversee PHANTOM while managing other duties.

Measurable ROI

Strong Payback Period

Reduced disposal costs plus revenue from processed outputs. Minimal maintenance creates a compelling return on investment.

Financial Impact

Turn Cost into Revenue

Stop paying to haul waste. Start selling what comes out.

The PHANTOM Equation

Disposal Savings

Eliminate haulage fees, landfill gate charges, and third-party waste contracts. Process on-site for ~$20 USD per cycle.

+

Output Resale Value

Sell high-calorie bio-coal (~5,000 kcal/kg), Class A fertiliser, or sterilised feed supplement to local buyers.

=

Net Positive ROI

Your waste line becomes a revenue line

Class A Compost

Pathogen-free, nutrient-rich soil amendment. Sell to agriculture, landscaping, or municipal greening projects.

High-Calorie Solid Fuel

Bio-coal at ~5,000 kcal/kg — a direct substitute for coal or biomass pellets in industrial boilers.

Liquid Fertiliser

Sterile nutrient solution for horticulture and precision agriculture. Ready for direct application.

Sterilised Feed Supplement

Processed protein-rich material suitable as livestock feed additive — reducing feed costs for farms.

Sustainability

Supporting Sustainable Development Goals

PHANTOM directly contributes to multiple UN Sustainable Development Goals, helping organisations meet their ESG commitments.

SDG 7

Affordable & Clean Energy

Biomass fuel output supports renewable energy targets.

SDG 9

Industry, Innovation & Infrastructure

Advanced hydrolysis technology for industrial waste treatment.

SDG 11

Sustainable Cities & Communities

On-site waste processing reduces transport and landfill pressure.

SDG 12

Responsible Consumption & Production

Circular economy: waste becomes compost, feed, and fuel.

SDG 13

Climate Action

Zero dioxins and suppressed CO₂ emissions support carbon neutrality.

SDG 14

Life Below Water

Reducing plastic and organic waste that reaches marine environments.

Compliance

Future-Proof Your Compliance

Governments are investing in green technology. PHANTOM helps you qualify for incentives — and avoid penalties.

Carbon Credits & Tax Incentives

Zero-emission processing qualifies for carbon offset credits in many jurisdictions. Reduced landfill usage may unlock tax deductions and green manufacturing incentives.

Government Grants for Green Tech

Many countries offer capital grants, subsidised loans, or accelerated depreciation for sustainable waste infrastructure. PHANTOM installations have qualified for green technology incentive programmes in multiple markets.

Avoid the Carbon Tax

Carbon pricing is expanding globally. Incineration carries a growing tax burden. PHANTOM's zero-combustion process means zero carbon tax liability on your waste operations — a cost advantage that grows every year.

Industries Served

Waste Stream Versatility

PHANTOM processes different waste types across industries — each with a specific, measurable outcome.

Hospitals & Healthcare

Safely treat PVC and infectious waste on-site

Eliminate hazardous waste transport risks. PHANTOM sterilises and decomposes medical waste — including plastics, sharps containers, and biohazard materials — within 30 minutes.

Farms & Agriculture

Convert manure into pathogen-free fertiliser in 30 min

Transform livestock manure, crop residuals, and abattoir waste into Class A compost or sterilised feed supplement. No odour, no pathogens, no waiting months for composting.

Factories & Manufacturing

Eliminate sludge disposal fees entirely

Process industrial sludge, food processing waste, and organic byproducts on-site. Stop paying third-party haulers — reduce volume by 60% and sell the output.

Food & Hospitality

Zero food waste to landfill — zero odour complaints

Hotels, restaurants, and supermarkets can process food waste on-site daily. Sealed system means no smell, no pests, and no skip bins overflowing in the car park.

Municipal Government

Process community waste without building an incinerator

Modular containerised units can be deployed at transfer stations or community hubs. Zero emissions means no public opposition, no smokestacks, and fast permitting.

Marine & Offshore

On-board waste treatment for vessels and platforms

Compact footprint suits maritime and offshore installations. Process food waste, sewage sludge, and organic materials at sea — meeting MARPOL compliance without port disposal.

Ready to Reduce Your Waste Impact?

Speak with our team about how PHANTOM fits your operation and budget.

Frequently Asked Questions

Typically 18–24 months, based on avoided disposal fees alone. When you factor in revenue from selling bio-coal (~5,000 kcal/kg), Class A compost, or sterilised feed supplement, the payback period can shorten significantly. Exact timelines depend on local disposal costs, waste volume, and output resale prices — our team provides a site-specific ROI projection during the proposal stage.

In most jurisdictions, PHANTOM's solid fuel output is classified as a recovered resource or secondary fuel — not waste. This is a critical legal distinction: it means the output can be sold, stored, and transported under fuel or commodity regulations rather than waste management laws. Classification varies by country, so we work with each client to confirm the local regulatory status and provide the supporting documentation needed for compliance.

In many markets, yes. PHANTOM installations have qualified for government grants, subsidised green loans, accelerated depreciation schemes, and carbon offset credits across multiple countries. Because the system produces zero harmful emissions and generates a renewable solid fuel, it aligns with most national green technology and circular economy incentive programmes. We assist clients with identifying applicable grants and preparing documentation as part of the project proposal.

PHANTOM can operate continuously in shift patterns — each cycle takes 30–50 minutes, and the system can run back-to-back cycles throughout the day. Major maintenance (gasket replacement) is required only every 10 years. Routine checks between cycles take minutes, not hours. The PLC control system monitors all critical parameters in real time, so unplanned downtime is exceptionally rare. Most operators achieve 90%+ uptime without dedicated maintenance staff.