Technology Comparison Hub

PHANTOM vs Every Alternative

Incineration, autoclave, composting, anaerobic digestion, landfill — how does PHANTOM compare on cost, emissions, cycle time, outputs, and compliance? Select a comparison below or review the full summary table.

At a Glance

Full Comparison Summary

All key metrics across all five treatment alternatives.

MetricPHANTOMIncinerationAutoclaveCompostingAnaerobic DigestionLandfill
Cycle time~30 minutesContinuous / off-site1–4 hours60–90 days20–40 daysPermanent
On-site operation✓✗ (off-site)✓✓ (large land)✓ (large infra)✗ (off-site)
Zero dioxins✓✗✓✓✓✓
Pathogen kill (STAATT III)✓ >99.9%✓✓ (if validated)✗ unreliable✗ unreliable✗
Sellable outputs3 (compost, fertiliser, fuel)0 (fly ash = hazardous waste)01 (compost)1 (digestate)0
Approx. OPEX / tonne~£11–16£130–617£20–60 + residual disposal£15–40 (land cost excluded)£25–55£126.15+ (tax alone)
EU/UK ETS liability (2028)NoneHighLowNoneLow (methane)High (methane)
Handles contaminated streams✓✓Partial✗✗✓ (costly)

Deep Dives

Head-to-Head Comparisons

Medical · Industrial · Municipal

PHANTOM vs Incineration

PHANTOM wins on cost, emissions, and compliance risk

Full Comparison →

PHANTOM

  • ✓Zero dioxins / fly ash
  • ✓~£11–16/tonne OPEX
  • ✓No EU ETS liability
  • ✓30-min cycle
  • ✓3 sellable outputs

Incineration

  • ✗Dioxins + hazardous fly ash
  • ✗£130–617/tonne gate fee
  • ✗EU ETS carbon cost from 2028
  • ✗Off-site haulage required
  • ✗No usable outputs
Medical · Healthcare

PHANTOM vs Autoclave

PHANTOM sterilises AND converts — autoclave only sterilises

Full Comparison →

PHANTOM

  • ✓Sterilises + decomposes waste
  • ✓~£11–16/tonne OPEX
  • ✓3 sellable outputs
  • ✓No residual waste volume
  • ✓30-min on-site cycle

Autoclave

  • ✗Sterilises only — no decomposition
  • ✗Residual waste still needs disposal
  • ✗No output value recovered
  • ✗High water + energy use
  • ✗Separate disposal contract still required
Agriculture · Food · Organic

PHANTOM vs Composting

PHANTOM: 30 minutes. Composting: 60–90 days

Full Comparison →

PHANTOM

  • ✓30-min cycle
  • ✓Fully enclosed — zero odour
  • ✓STAATT Level III pathogen kill
  • ✓Processes all organic waste
  • ✓Liquid fertiliser + solid output

Composting

  • ✗60–90 day cycle time
  • ✗Open windrows — odour & land use
  • ✗Pathogens not reliably destroyed
  • ✗Cannot process contaminated streams
  • ✗Compost only — no liquid output
Agriculture · Food · Organic

PHANTOM vs Anaerobic Digestion

PHANTOM handles contaminated streams AD rejects at the gate

Full Comparison →

PHANTOM

  • ✓30-min cycle
  • ✓Handles contaminated mixed waste
  • ✓No infrastructure scale required
  • ✓Liquid fertiliser + solid fuel output
  • ✓On-site, compact footprint

Anaerobic Digestion

  • ✗20–40 day digestion cycle
  • ✗Rejects contaminated / mixed streams
  • ✗Requires large infrastructure
  • ✗Digestate disposal still needed
  • ✗High capital & operating complexity
Industrial · Manufacturing · Logistics

PHANTOM vs Landfill

UK landfill tax at £126.15/tonne — PHANTOM eliminates the cost entirely

Full Comparison →

PHANTOM

  • ✓~£11–16/tonne OPEX
  • ✓Zero landfill tax liability
  • ✓3 sellable outputs
  • ✓On-site — no haulage cost
  • ✓Supports zero-waste-to-landfill certification

Landfill

  • ✗£126.15/tonne standard rate (2025/26)
  • ✗Rising £10/yr by statutory escalator
  • ✗No output value — pure cost
  • ✗Haulage + gate fee on top
  • ✗Regulatory and reputational risk

Not Sure Which Comparison Matters for Your Operation?

Tell us your waste stream and current disposal method — we'll send you the relevant cost model and a site-specific ROI estimate within 5 business days.