Interactive Calculator

Waste-Saving Calculator

Model the annual variable-cost saving of treating organic waste on-site with subcritical water hydrolysis — versus sending it all to landfill.

Changing currency only swaps the symbol — values are not converted. Enter all figures in the selected currency.

A · Throughput

Advanced
34
Cycles / day
102
Tonnes / day
714
Tonnes / week
37,128
Tonnes / year

Partial cycles are dropped (cycles/day is rounded down).

B · Waste volume & current (before) cost

Following modelled throughput (37,128 t/yr). Edit to model a subset.

Before cost (landfill only): $8,168,160 / year

C · After Subcritical Water Hydrolysis processing & output

Mass reduces to 65% of input (24,133.2 t output from 37,128 t input).

Subcritical water hydrolysis also produces a small liquid wastewater byproduct. Disposal cost depends on your site's effluent handling and is typically minor. Leave the volume at 0 if you handle it in-house at no marginal cost.

Residual solids always incur the landfill cost per tonne.

Residual disposal cost: $5,309,304 / year
Wastewater byproduct: $0 / year

D · Subcritical Water Hydrolysis fuel (running) cost

Standard: 35 L boiler fuel per cycle.

Fuel cost: $606,424 / year(12,376 cycles × 35 L × $1.40)

E · Resale revenue (offtake)

Resale revenue is optional and should be validated against your local market before relying on it.

Before — landfill only
$8,168,160
After — Subcritical Water Hydrolysis
$5,915,728
Breakdown
  • Residual disposal$5,309,304
  • Wastewater byproduct$0
  • Fuel cost$606,424
  • Less resale revenue−$0
Annual saving
$2,252,432
−27.6% reduction
Before (landfill only)$8,168,160
After (Subcritical Water Hydrolysis)$5,915,728
Assumptions: mass reduction to 65% of input; split mode assumes 10% precipitate / 90% liquid of the output; solid mode can include a small wastewater byproduct disposal cost; variable costs only — excludes capex, labour, water, and maintenance. Figures are estimates for comparison only.
Remarks: these figures are for reference only. Actual results vary with your site, waste stream, energy prices, and local disposal rates. They are estimates only and need to be discussed and confirmed with our team for your site; the machine price is quoted per project. Request a site-specific assessment before relying on them for any decision.

Want figures tailored to your facility?

Our team will model your exact waste streams, throughput, and local costs.

Phantom Eco Tech — International Representative for Phantom, Japan